Projects

Here are some of the teams that we've been a part of.



Legoland, Birmingham

Laser scanning


Pre-construction and construction phase surveys.

Measured building survey

Area report

Topographical survey

Utility surveys

Concrete slab tolerance surveys

Bellway, Shinfield


Site setting out


Regular setting out support for 18 months on a site for 130 houses.

Roads

Drainage

Piles

Foundations

Brickwork

Stockpile surveys

UCLH A&E

Point cloud


Regular construction phase surveys.

Survey of existing structure to check that design fits

Datum establishment

Setting out of gridlines

As-built surveys

ESP Leicester


Point cloud


Pre-contruction phase surveys.

Measured building survey

Topographical survey

Utility survey

Control establishment